Product Description
Quick Details
Material: | Copper | Technics: | Forged | Type: | Coupling |
Place of Origin: | QIngdao, CZPT (Mainland) | Model Number: | AT 09 | Brand Name: | AT |
Connection: | Welding | Shape: | Equal | Head Code: | Round |
Certificates: | CE ISO | Usage: | Plumbing & CZPT System |
Packaging & Delivery
Packaging Details: | Export netural packing (PCV bag,inner white box,master carton, Pallet.) or Cutomized packing as request. |
Delivery Detail: | 30-45 days after receiving deposit |
Packing:
Factory:
Specifications
1.Quality Priority
2. CZPT service
3. reasonable price
4. oversea service support
5. 321 stainless steel
ABOUT US:
As your one-stop source, AT PRECAST,we design, manufacturer and distribute precast concrete accessories including the CZPT ing Systems and CZPT ing systems Coil and Ferrule Inserts. for Concrete and Prefabricated area.
As a leader in developing concrete accessory products, CZPT main goal is to produce products that are safer, CZPT er and more cost efficient.
With more than totally 50 years working experience, CZPT entire staff is dedicated to provide you with the best CZPT er service and competitive prices. Our sales force are able to answer your questions quickly and offer you technical support .
Assurance:
100% quality manufacturing.
We guarantee that our products meet your supplied specifications
Extremely competitive pricing
Delivery to your port or front door
4 —- 8 week lead times
We handle all paperwork
Partial container orders
Flexible payment options
Unique tooling options
Full range of packaging options from bulk to retail ready
Complete testing services available
FAQs:
1. Where is your location?
We are located in HangZhou City of CZPT and are closed to Airport. It takes 30minuts by car from Liuting Airport CZPT company.
2. How CZPT has the company been established?
AT INDUSTRY was established in 2009. There is 6 years exporting experiences.
3. How many employees do you have?
Administration / sales 4
Engineering / design as CZPT partner 8
Production as CZPT partners 120
Quality assurance / inspection 10
4. Which countries do you export to?
U.S.A, Germany, France, CZPT , UK, Brazil, Middle east of Asia, Thailand,
5. What proportion of your goods are exported?
100% of CZPT production are exported to all over the world.
6. How CZPT does it take to receive samples?
a) Pattern:30-45days after order
b) Sample:30days after pattern finishing.
c) The lead time is the general production period and does not include the transportation time.
7. New product development process
Got tooling order and sample order with 50% deposit—Hold a meeting with the relation dept. to ensure the developing schedule—Design pattern, fixture and gauge and making them in CZPT house—mold steel buying—Machining—Inspection—Send out the sample with initial inspection report.
8. How CZPT is the manufacturing lead time?
Mass Production: 90days after sample approval by yours.
The lead time is the general production period including the transportation time.
We could make some special production arrangement effectively if CZPT er has urgent need.
9. What basis can we buy goods?
We generally offer CZPT ers prices FOB& CIF (Carriage, Insurance & Freight). The CIF includes the freight cost to your nominated sea port.
We do provide clearance of goods which needs to be handled by a local freight forwarder.
All local costs and taxes are the responsibility of the buyer. We are happy to offer advisement on shipping if required.
10. What are the payment terms?
Payment terms are negotiable and will improve for CZPT term CZPT ers.
During the initial stages, we request 50% of tooling fee in CZPT with the balance payable on acceptance of samples.
Production orders can be negotiable. We prefer 50% deposit and the balance by T/T before sails. But sometimes T/T 30 days after sails would also acceptable.
11. Which currency can we buy in?
We can deal in USD / CZPT currency / GBP.
12. How CZPT does it take to ship goods from CZPT by sea?
It takes about 5 weeks to CZPT pean ports plus 1 week CZPT s clearance, so you can get the container within 6 to 7 weeks. It takes about 2 weeks to east coast and 3 weeks to west coast US ports. All sea goods are shipped from HangZhou Port.
13. How CZPT does it take to ship goods from CZPT by air?
It takes about 7 days to all major destinations.
14. Can we visit the factory to conduct an audit?
Yes, you are welcome to visit CZPT partner factory by prior agreement.
15. How do we retain client confidentiality?
We are happy to sign Confidentiality Agreements with CZPT ers and will honor them.
16. Which languages do we do business in?
Although we do business with many countries around the world, we can only communicate effectively in Chinese English.
All information supplied should therefore be supplied in this form.
17. Is there a minimum volume of business required to conduct international purchasing?
There are no minimum volumes, but the prices of the goods, plus the fixed costs of importing makes it more economical to buy in high volumes. All potential CZPT ers will be assessed on an individual basis to determine if it appears a viable option for all parties to develop a relationship.
18. What type of parts you are specialized in?
Our business contains two areas,
one is for construction precast including lifting system, rigging hardware metal parts.
Another is CZPT ized metal business of quality sand castings, investment castings, lost foam castings, hot forgings, cold forgings, stampings, machined parts, injectionmolded plastics parts, etc.
19. Which kind of equipments do you have?
Forging friction press 160Ton, 300Ton, 630Ton, 1200Ton
Casting furnace of 200kg, 500kg,1000kgs, 2000kgs
Press of 63ton, 120tons
CNC Machining center
CNC Vertical Lathe
CNC Lathe center
Boring machine
Drilling machine